Pureco slot drains at M83 highway
  • M83 Győr, 2022
  • Colas Zrt.
  • construction of transport infrastructure
  • Stormwater management
  • slot drain
  • 3 km

Construction work on M83 motorway between Győr and Pápa in Hungary is taking place intensively. 
With regard to the current development, a 36-km long new road will be built, to connect small villages along the route to the infrastructure.

In the current phase of the project, 2,800 m long, I-profile slot pipes are delivered in three phases this year to the Győr access session of the highway Profile I slot drains are suitable for draining rainwater contaminated with small quantities of oil products (drips) from surfaced areas such as high-capacity traffic structures (motorways, dual carriageways, main roads, tunnels, runways, lay-bys, large parking lots, etc.).